Projects > Geotechnical/Structural > La Jolla Alta Master Council
 

La Jolla Alta Master Council:

  • Erosion of canyon as deep as 50 feet and as wide as 30 feet over ½ of a mile

  • Due to a neglected storm drain, emergency repairs were performed to address erosion, failed slope and unstable cliffs

  • The repair fixed the existing problem and prevented future damages from occurring
 
     
    < Back | Next >